FACILITY STATUS

Operational Facilities

Operational Facilities Type #1
Plant Location Employees Capacity MW Capacity Components (MW X Units) Fuel Type
Yeongheung
Division
Incheon-si
Ongjin-gun
in Korea
707 5,080 800 X 2
870 X 4
Bituminous Coal
Samcheonpo
Division
Gyeongsangnam-do
Goseong-gun
in Korea
524 2,120 560 X 2
500 X 2
Bundang
Division
Gyunggi-do
Seongnam-si
in Korea
166 622 GT 77.8 X 8 LNG
300 ST 185 X 1
ST 115 X 1
Yeongdong
Division
Gangweon-do
Gangnung-si
in Korea
193 325 125 X 1
200 X 1
Biomass
Yeosu
Division
Jeolanam-do
Yosu-si
in Korea
174 328.6 328 X 1
+(350 X 1)
Bituminous Coal
Operational Facilities Type #2
Load Type Plant Name Fuel Installed Capacity Remarks
Total     9,820.3MW 9,820.3[100%]
Base Load Yeongheung Bituminous 5,080 MW 7,868.7
[84.7%]
Samcheonpo Bituminous 2,120 MW
Yeosu Bituminous 668.6 MW
Peak Load Bundang LNG 922.1 MW 922.1[9.9%]
Renewable Biomass[Yeongdong #1,2]
wind power, hydro power, etc.
  489.6 MW 489.6[5.2%]
  • Yeongheung Thermal Power Plant 5,080.0 MW 57.78 %
  • Samcheonpo Thermal Power Plant 2,120.0 MW 24.11 %
  • Bundang Combined Cycle Power Plant 922.1 MW 7.6 %
  • Yeosu Thermal Power Plant 668.6 MW 10.48 %