Operational Facilities
Plant | Location | Employees | Capacity MW | Capacity Components (MW X Units) | Fuel Type |
---|---|---|---|---|---|
Yeongheung Division |
Incheon-si Ongjin-gun in Korea |
707 | 5,080 | 800 X 2 870 X 4 |
Bituminous Coal |
Samcheonpo Division |
Gyeongsangnam-do Goseong-gun in Korea |
524 | 2,120 | 560 X 2 500 X 2 |
|
Bundang Division |
Gyunggi-do Seongnam-si in Korea |
166 | 622 | GT 77.8 X 8 | LNG |
300 | ST 185 X 1 ST 115 X 1 |
||||
Yeongdong Division |
Gangweon-do Gangnung-si in Korea |
193 | 325 | 125 X 1 200 X 1 |
Biomass |
Yeosu Division |
Jeolanam-do Yosu-si in Korea |
174 | 328.6 | 328 X 1 +(350 X 1) |
Bituminous Coal |
Load Type | Plant Name | Fuel | Installed Capacity | Remarks |
---|---|---|---|---|
Total | 9,820.3MW | 9,820.3[100%] | ||
Base Load | Yeongheung | Bituminous | 5,080 MW | 7,868.7 [84.7%] |
Samcheonpo | Bituminous | 2,120 MW | ||
Yeosu | Bituminous | 668.6 MW | ||
Peak Load | Bundang | LNG | 922.1 MW | 922.1[9.9%] |
Renewable | Biomass[Yeongdong #1,2] wind power, hydro power, etc. |
489.6 MW | 489.6[5.2%] |
- Yeongheung Thermal Power Plant 5,080.0 MW 57.78 %
- Samcheonpo Thermal Power Plant 2,120.0 MW 24.11 %
- Bundang Combined Cycle Power Plant 922.1 MW 7.6 %
- Yeosu Thermal Power Plant 668.6 MW 10.48 %